News
-
02 November '20Kirklees Top 100 Listed Company
Chemfix has been identified as one of the top 100 businesses out of 17,300 registered businesses in the Kirklees region. Kirklees is an area with a population of approximately 420,000.
-
14 October '20UFI Labelling Explained
From 2021, a new label element will have to appear on the labels of all products classified for health or physical hazards.
-
15 September '20Wipe The Slate Clean
SUPER WIPES are an effective way to keep your working tools, hands and surfaces completely clean when on site, in a market leading extra large industrial size.
-
20 August '20Vinylester ECO Resin WRAS Approval Now Available to Clone
Vinylester ECO is the next of the chemical anchor range which now has WRAS approval which covers the use of cured resin in contact with potable (drinking water). CH+, Chemfix 500 and Pure Epoxy 1:1 are also covered by WRAS.
-
07 July '20Diamond Drilling in Cracked Concrete
The diamond drilling installation technique in cracked concrete is now added to the Chemfix ETA 19/0705 covering specifically sizes M12 to M24 and rebar 10mm to 25mm in dry/wet and flooded conditions in two temperature ranges.
-
18 June '20Improved Colour Contrasting for EHB60
Timbabuild EHB60 Super Tough Epoxy Wood Repair with 50 year guarantee will now be easier to mix thoroughly as the colours of both the resin and hardener components have been re-pigmented to make them more clearly defined.
-
17 June '20Dustless Drilling Added to Three ETA's
The dustless drilling method is now added to the following ETA's 18/10525 which covers the Chemfix CH200, Vinylester ECO/EASF Top and Chemfix 100 pure epoxy - 18/0797, 18/0800 & 19/0705 respectively.
-
01 June '20
-
01 May '20CLENZE For Safety & Hygiene
For your safety & hygiene in the workplace. A new product to promote increased cleanliness.
-
23 March '20Creating a Removable Fixing in Hollow Voids
Creating a fully removable & adjustable Chemical Anchor fixing with either Masonry, Blocks or Hollow voids.
-
26 February '20International Hardware Fair Postponed Until 2021
We received notification yesterday from the event organisers that the Cologne Hardware Fair is Postponed until Spring 2021.
-
07 January '20Chemfix Arctic ETA 19/0820
For installations at extreme low temperatures down to -20°C look no further than the newly improved Chemfix Arctic formula. The new Styrene Free formula now has the benefit of a high quality European Approval for studs and rebar.
- Copyright © 2021 Chemfix
- Legal note
- Use of cookies